Client: Moss Construction
The refurbishment of all the external sealant work which required the
removing and replacing of the sealant giving a 10 year warranty under
the Arbo Master scheme, using NVQ qualified applicators.
Clients: Mowlem Construction and Stone Cladding International
This is our largest single project with a value over £300,000 of
sealant. This required applying sealants to Precast Cladding, Marble,
Glazing and Structural Glass to
Client: Diamond Construction.
Machine applied two part sealant to the Petrapave concrete paving,
sealing the forecourt, preventing petrol, oil and other contaminants
penetrating below the surface.
Client: Taylor Woodrow Construction
Silicon Stained Polished Stone Panels. All Mastic contracted to remove
silicon sealant installed by others, applying a poultice to draw the
oils out of the stone and install non staining sealant.